Houston, Texas   |   Cultural Arts

CLIENT: Foundation for Jones Hall

SIZE: 100,000 sf

SERVICES: Full Architectural Services

DATE COMPLETED: Estimated 2025

Studio RED was selected to perform a complex, multi-phased renovation on the iconic Jones Hall, originally built in the 1960s. To allow for ongoing performances, construction is occurring when the Symphony Hall is dark and all phases of work will be complete by the end of 2025.

In 2021 and 2022 the design team updated the side walls to provide better acoustics, replaced the veneer in the hall and created safe areas in the catwalks and lighting positions. Work also included adding a new AV room above the stage, new orchestra lift/seat wagons, new stage flooring, laying the foundation for an updated AV, lighting and IT infrastructure and new restrooms with better access from the lobby.

In 2023 the team replaced all seating and reconfigured the layout from continental seating to include aisles and less doors, better controlling sound and light. Additionally, AV and lighting improvements will continue, a new green room was created and updates made to lobby finishes.

2024 projects included acoustic enhancements by adding a new ceiling reflector, new motorized rigging, enhanced Audio and Video installation, and a new green room. The final phase of work for the project will begin in 2025 and will include a new accessible patron entry, updated dock, and dressing room

 

Before

After

Jones Hall for the Performing Arts

Houston, Texas   |   Cultural Arts

CLIENT: Foundation for Jones Hall

SIZE: 100,000 sf

SERVICES: Full Architectural Services

DATE COMPLETED: Estimated 2025

Studio RED was selected to perform a complex, multi-phased renovation on the iconic Jones Hall, originally built in the 1960s. To allow for ongoing performances, construction is occurring when the Symphony Hall is dark and all phases of work will be complete by the end of 2025.

In 2021 and 2022 the design team updated the side walls to provide better acoustics, replaced the veneer in the hall and created safe areas in the catwalks and lighting positions. Work also included adding a new AV room above the stage, new orchestra lift/seat wagons, new stage flooring, laying the foundation for an updated AV, lighting and IT infrastructure and new restrooms with better access from the lobby.

In 2023 the team replaced all seating and reconfigured the layout from continental seating to include aisles and less doors, better controlling sound and light. Additionally, AV and lighting improvements will continue, a new green room was created and updates made to lobby finishes.

2024 projects included acoustic enhancements by adding a new ceiling reflector, new motorized rigging, enhanced Audio and Video installation, and a new green room. The final phase of work for the project will begin in 2025 and will include a new accessible patron entry, updated dock, and dressing room

 

Similar Projects

Let's talk about your project.